2005 Hydraulic components for CWRP (Changi Water Reclamation Plant) in Singapore. It is a compact and closed sewage treatment plant built using the latest technology. Designed to treat 800,000 cubic metres of wastewater daily it can be extended to a daily maximum capacity of 2,400,000 cubic meters.
1 Goods lift 20.000 Kg of carrying capacity and 49 m of car travel necessary for the building of the sewage treatment plant and its maintenance • 4 hydraulic cylinders ø 290 • 2 power units 60 kW • 1 power unit 9,5 kW 
|